Construction & Infrastructure

BASF, SABIC and Linde Develop Pilot Furnaces that Reduce CO2 by 90%

The start-up of the demonstration plant is targeted for 2023

Shabbir Khan, SME News Service

Chemical majors BASF, SABIC and Linde have started construction of the world’s first demonstration plant for large-scale electrically heated steam cracker furnaces that cut emissions drastically.

With the new technology BASF, SABIC and Linde aim to develop full-scale commercial production plants that can achieve significant reductions in carbon dioxide emissions, compared with today’s technology.

BMW Commences In-house Production of Fuel Cells for BMW iX5 Hydrogen

The demonstration plant will be fully integrated into one of the existing steam crackers at BASF’s Verbund site in Ludwigshafen, Germany.

It will test two different heating concepts, processing around 4 tonnes of hydrocarbon per hour and consuming 6 megawatts of renewable electricity/power. The start-up of the demonstration plant is targeted for 2023.

The project has been granted $14.63 million by the German Federal Ministry for Economic Affairs and Climate Action under its “Decarbonisation in Industry” funding programme, to help address challenges due to current framework conditions and energy costs.

Read More: Al Shawamikh, Frontech to Develop Sustainable Energy Solutions

Africa Climate Push: First Nature-Based Solutions Call Launched for Resilient Port Infrastructure

Global Climate Outlook: What the World Can Expect from April to June 2026

Dubai Humanitarian Delivers Critical WHO Medical Aid to Gaza Under Mohammed bin Rashid’s Directives

World’s First Hydrogen-Fuelled Main Engine Operation Marks Breakthrough for Shipping Industry

MTF Releases New Guidelines to Enhance Safety for Wind-Assisted Ships